Electric Work

Showing posts with label Blueprint. Show all posts
Showing posts with label Blueprint. Show all posts

Wednesday, January 7, 2015

Drawings & Symbols



Posted by Electric Work at 9:48 AM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: Blueprint

Tuesday, January 6, 2015

Kye Blueprint Symbols

Read more »
Posted by Electric Work at 11:30 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: Blueprint

Home Electrical Wiring Blueprint and Layout



Read more »
Posted by Electric Work at 11:00 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: Blueprint
Older Posts Home
Subscribe to: Posts (Atom)

Category

  • ★ POWERFUL ★ (10)
  • A My Profile (63)
  • Air conditioning (6)
  • Ambient Temperature (2)
  • Ampacity (22)
  • Architecture plan (1)
  • Attaching (1)
  • Attic (1)
  • Basement (1)
  • Basic Electric Circuit (1)
  • Basic Electric Videos (6)
  • Bathroom (12)
  • Bedroom (8)
  • Bending (7)
  • Blueprint (3)
  • Bonding (1)
  • Boxs (11)
  • Breaker (10)
  • Breaker & Wire size for Water heater (1)
  • Breaker Balanced (1)
  • Cable Clamp (3)
  • Calculation (7)
  • Ceiling (9)
  • Communication (1)
  • Compression EMT and Rigid-IMC Conduit Fittings (1)
  • Computers are connected Phase-to-Neutral (1)
  • Conductor Size (2)
  • Conductor Terminals (1)
  • Conduit Bending (3)
  • Conduit Bodies (1)
  • Conduit Connectors (1)
  • Conduit Installation (3)
  • Current carrying conductor (1)
  • Dedicated Circuits (1)
  • Directory IBEW Local Union (4)
  • Disconnect (1)
  • Distance and Wire Gauge (1)
  • Distribution (1)
  • Doorbell (1)
  • Dryers (2)
  • Electrical Rough In (3)
  • Electrical Safety (1)
  • EMT by Flex Tubes Indore (1)
  • Feeder Wiring Diagram (1)
  • Feeders (1)
  • Fire (1)
  • Fish Wires in Wall (1)
  • Fittings (32)
  • Furnace (4)
  • Garage (3)
  • Generator (2)
  • Ground (5)
  • Hallway (1)
  • Hand tools (1)
  • Harmonic (4)
  • Heater (2)
  • Home electrical Map (1)
  • Home Wire Size (1)
  • House Electrical Wiring Plan (5)
  • House videis (5)
  • How to Make Battery Cable (2)
  • Hypoxia (1)
  • IBEW videos (20)
  • Impedance (1)
  • Inspection (4)
  • Installation (2)
  • Interlock (3)
  • Job Tip (4)
  • Kitchen (23)
  • Knockouts (1)
  • Laundry (4)
  • LED Lamp (1)
  • legal to boot. (1)
  • Lights (15)
  • Living areas (1)
  • Magazine (1)
  • Metal Plates (nailing plates) (1)
  • Metal Stud Conduit (1)
  • Meter (4)
  • Motor (6)
  • NEC Code Video (6)
  • NEC Inspection Show Me How (2)
  • NECA & IBEW (1)
  • Neutral and Ground (1)
  • Neutral to Case Connection (1)
  • Nipple (1)
  • Offset (2)
  • Ohm's Law (2)
  • Outdoor (1)
  • Over head conductor (1)
  • Over head Service (1)
  • Over Loaded (2)
  • OverLoaded (1)
  • Panel (33)
  • Panel Breaker 240 Balanced (1)
  • Panel Wiring Diagram (24)
  • Plug 3 & 4 prong cords 120 & 240 volt (15)
  • Plug and Cord (1)
  • Pole (1)
  • Power Design Inc. (3)
  • Project (1)
  • Receptacle Outlets (16)
  • Repairing A Large Damaged Electrical Cable (1)
  • Residential Wiring (2)
  • Schematic diagram (2)
  • Security Systems (2)
  • Service (5)
  • Single Phase Electrical City (1)
  • Smoke Alarm (1)
  • Smoke Detector (2)
  • Solar Energy (11)
  • Solder (2)
  • Spa (1)
  • Sunroom (1)
  • Surge Protection (2)
  • Switchs (10)
  • Tables (3)
  • Tapped (1)
  • Telephone Wiring Diagram (1)
  • Temperature Rating of Conductor (1)
  • Testers (4)
  • Thermostat (1)
  • Track Light (1)
  • Transformer (6)
  • Unbalanced loads (1)
  • Vibration (1)
  • Voltage Drop (4)
  • VOLTs OHMs & AMPs (1)
  • Water heater (4)
  • Wattage Rating (1)
  • Wattage Rating for Common Household Appllances (1)
  • Wire (43)
  • Wire Tool (1)
  • Wiring and Raceway Chart (1)
  • Wiring Diagram - 230 Volt (1)
  • ОУЦС (30)

Monthly Specials Prise

Monthly Specials Prise
$99 for the installation of a ceiling fan Monthly Specials

Monthly Specials Prise

Monthly Specials Prise
$125 for an Outdoor Electrical Box Installed Monthly Specials

Monthly Specials Prise

Monthly Specials Prise
$149 for two hours of electrical labor_light

Monthly Specials Prise

Monthly Specials Prise
$389 for four recessed lights with a dimmer switch installed!

Electric Dedicated Circuit. Light_Receptacle

Electric Dedicated Circuit. Light_Receptacle
20 A mid-range items, like hair dryers and toasters. 30-50 A for heavy duty appliances like dryers. These breakers typically offer "double pole" protection to prevent the circuit from drawing too much power, possibly resulting in a fire.

Commercial and Industrial Wiring and Raceway Chart (continued)

Conductor size based on 75C Terminal rating [110.(C)(1)].

Ampacity based on four 90C current-carrying conductors

Table 310.15(B)(3)(a) and

Table 310.(B)(16).

Maximum continuous nonlinear load in an ambient temperature of 30C limited to 80 percent of

the overcurrent device rating or

the conductor ampacity,

which ever is less

[210.19(A), 240.6(A), 215.2(A)(1)].

To ensure ease of installation, raceways are sized to

six THHN conductors in PVC conduit [Annex C. 10].

Copper equipment grounding conductor is sized in accordance with Table 250.122.

Maximum continuous load is limited to 80 percent of 75C

conductor ampacity because the conductor ampacity is lower than

the overcurrent protection device rating.

Wire_Size Amp_Chart For Home

Wire_Size Amp_Chart For Home

BAYAR

BAYAR
I worked on 42 Townhouse's electrical work in VI at Glenview 2501 Indigo Ln. Glenview, IL 60025 — in Glenview, Illinois.

Solar Photovoltaic

Solar Photovoltaic

NU LINE TECHNOLOGIES,

NU LINE TECHNOLOGIES,
I've worked in NU LINE TECHNOLOGIES, INC from 2008-2009 on BURR RIDGE: Residential and Commercial Village, successfully completing electrical work on 3 floor of 42 units with 4-6 bedroom & 3-4 bathrooms

Union Local 134, Nu Line Technologies 2007-2008

Union Local 134,  Nu Line Technologies 2007-2008
Job history: NU LINE TECHNOLOGIES, INC. 2008 Residential and Commercial. 900 S. CLARK St. Chicago, IL 60605. Completed Electrical work of Studios,1, 2 and 3 bedrooms of 134 units from 420 units in total of 24 floors of building — at Downtown Chicago.

IBEW - NECA TECHNICAL INSTITUTE 2004

IBEW - NECA TECHNICAL INSTITUTE 2004
At UNION LOCAL NUMBER 134 — in Alsip, Illinois.

CANADIAN LABOR CONGRESS and AMERICAN FEDERATION OF LABOR and CONGRESS OF INTERNATIONAL ORGANIZATION

CANADIAN LABOR CONGRESS and AMERICAN FEDERATION OF LABOR and CONGRESS OF INTERNATIONAL ORGANIZATION
Started my membership in I.B.E.W. UNION LOCAL # 134 one of happiest days of my life. — in Chicago, Illinois. — in Chicago, Illinois.

Assurance

Assurance

VanPic2

VanPic2
2009

JZ ROOFING INC 1998-1999.

JZ ROOFING INC 1998-1999.
I worked for JZ Roofing INC from 1998-1999. — in Chicago, Illinois.

J_Z ROOFING INC.

J_Z ROOFING INC.

N.E.C.A & I.B.E.W International Brotherhood of Electrical Workers Local 134 Chicago

N.E.C.A & I.B.E.W International Brotherhood of Electrical Workers Local 134 Chicago
I had a membership in I.B.E.W at Union local #134 from 2001-2010. During this time i have participated in more than 10 huge projects. Chicago & Cook County Building & Construction Trades Council 600 W . WASHINGTON BLVD. CHICAGO, IL 60661-2490 — at Downtown Chicago.

ECI Forman Lany

ECI Forman Lany

Alex Husko

Alex Husko
ELECTRICAL CONTRACTORS, INC.

Glenview IL

Glenview IL
I worked on 42 Townhouse's electrical work in VI at Glenview 2501 Indigo Ln. Glenview, IL 60025 — in Glenview, Illinois.

BAYAR

BAYAR
Original documents issued by International Brotherhood of Electrical Workers Union Local Number 134 — at Downtown Chicago.

Also completed electrical works at Astor Place 710 S Milwaukee Ave. Wheeling, IL 60090 — in Wheeli

Also completed electrical works at Astor Place  710 S Milwaukee Ave. Wheeling, IL 60090 — in Wheeli

IBEW, Local 134 of Electrical Workers, Local 134, 2008

IBEW, Local 134 of Electrical Workers, Local 134,  2008
Reference letters from my Employers and Colleagues: Alex J Husko - Project Manager Electrical Contructors Incorpated Brett Epperson - Forman Nuline Technologies David Rudofski - Project Manager Nuline Technologies Sam Buonauro - Supervisor at Nuline Technologies — in Chicago, Illinois.

2000-KOREAN ELECTRIC COMPANY

2000-KOREAN ELECTRIC COMPANY
2001-NU LINE TECHNOLOGIES, INC. 9-4-2001. CANADIAN LABOR CONGRESS and AMERICAN FEDERATION OF LABOR and CONGRESS OF INTERNATIONAL ORGANIZATION. I.B.E.W. UNION LOCAL # 134 — in Chicago, Illinois.

Constantly

Constantly

Electrician

Electrician

Marshall Brothers, Inc.

Marshall Brothers, Inc.
I started my own sub-contract PROFESSIONAL ROOFING & SHEET METAL company "Bayar and brothers" in association with Marshall Brothers, Inc. in 2000 W-2 Form — in Lake Bluff, Illinois.

MARRSHALL BROTHERS INC.

MARRSHALL BROTHERS INC.

Commercial and Industrial Wiring and Raceway Chart

Commercial and Industrial Wiring and Raceway Chart

Commercial and Industrial and Raceway Chart (continued)

(1) Conductor size based on 75C terminal rating [110.14(C)(1)].

Ampacity based on four 90C current – carrying conductors

Ø Table 310.15(B)(3)(a) and

Ø Table 310.15(B)(16).

(2) Maximum continuous nonlinear load in an ambient temperature of 30C limited to 80 percent of the

Ø overcurrent device rating or

Ø conductor ampacity

(3) To ensure ease of installation, raceways are are sized to six THHN conductors in PVC conduit

Ø Annex C. 10.

(4) Copper equipment grounding conductor is sized in accordance with

Ø Table 250. 122.

(5) Maximum continuous load is limited to 80 percent of

Ø 75C conductor ampacity

Because; The conductor ampacity is lower than the

Ø overcurrent protection device rating.

Electric Plan

Electric Plan
Electric Plan

Breaker Amps X Branch Voltage Wattage Capacity

Breaker Amps X Branch Voltage Wattage Capacity

Wattage Rating for Common Household Appllances (continued)

-Check local regulations for restrictions and permit requirements before beginning electrical work-

An overloaded circuit can heat up to extreme temperatures creating a serious fire hazard and a threat to life and property.

To protect against an overload always know the capacity of the circuit and how much power is drawn by the appliances before adding a new outlet.

To calculate the capacity multiply the amp rating of the breaker by the voltage of the circuit or:

(Breaker Amps X Branch Voltage = Wattage Capacity)

Ø 15A x 120V = 1800W

For a 120 volt circuit with a 15 amp breaker this would be 1800 watts, the total load from appliances should not exceed

Ø 80% of this total, or

Ø 1440 watts.

To determine the total watts drawn, calculate the load of

Ø all the devices plugged into the circuit.

First determine which electrical appliances are plugged in by turning off the

Ø Breaker and

Ø Counting all the device that stop working.

Next, add the watts drawn by each device, for example, a circuit with a ceiling fan, MV and two lamps with 60 watt bulds up to 1,010 watts if all these devices are running at the highest speed, all at the same time.

This is 56% of the available capacity for a 15 amp/120 volt circuit, making it a good candidate for adding a new electrical outlet.

Finding the Wattage for Appliances

The wattage rating information for a particular device may be on a

Ø label or

Ø imprinted on the back somewhere.

If no wattage rating is displayed, the load can be calculated by multiplying the amps nor the wattage ratings for a device is known the chart below lists common household

Ø appliances and the average

Ø watts drawn for each to aid in calculating the load of a circuit.

International Electrical Brotherhood of Electrical Workers. Union Local 134

International Electrical Brotherhood of Electrical Workers. Union Local 134

White House

White House

Precision modelling for architecture with

Precision modelling for architecture with
Finally, turn on all layers so that we can get a grasp of our progress thus far.

utility

utility

Pole to Meter

Pole to Meter

home_automation

home_automation

Electrical Final

Electrical Final

ground

ground

detgar

detgar

house electrical circuit layout

house electrical circuit layout
Copyright . Awesome Inc. theme. Powered by Blogger.